Update: Readying For The Second Floor

Wednesday, June 24th, 2009

As the building goes up, it becomes more difficult to construct. We are now building scaffolding for the workers. It is made with tree poles and the horizontal supports are placed into holes in the wall. The holes in the walls will be patched later.

Tree Pole Scaffolding

This view is the end of the building that will hold the library (on the ground floor) and recording studio (on the second floor). You can now get a good feel for the size of the library as the walls are completed for the ground floor.

The Library & Second Floor Recording Studio

(more…)

Posted in Uncategorized | No Comments »

|

Share This Page on Twitter

btn-post-to-twitter

Become A Fan on Facebook

Latest Blog Post

An Update On Kigoma, April 2010

Here is an update on the community center.
We have spent some time designing and constructing the stairs to the radio/recording studio.  This is a Lowell Wertz design.  We built the pillar of Hercules, 20 inch square, rebar reinforced column,  then a metal platform landing for outside the second story door, then a metal beam made [...]