An Update On Kigoma, April 2010

Wednesday, April 14th, 2010

Here is an update on the community center.

We have spent some time designing and constructing the stairs to the radio/recording studio.  This is a Lowell Wertz design.  We built the pillar of Hercules, 20 inch square, rebar reinforced column,  then a metal platform landing for outside the second story door, then a metal beam made from angle iron and flat stock to support the stairs, and finally the stairs.  They aren’t done yet, but you can get the idea.

The floor in the BIG room has been poured.  It took some weeks as it is a lot of concrete to mix by hand.  All concrete for floors has been poured except for the toilets and kitchen.  We still have some plumbing work to do in those rooms, first.  We are still considering the floor finish, if it should be tile or what.

We are going to finish up the library first.  The walls have been plastered and the electrical system is in.  Won’t be long now.

Outside, we are creating an entrance way — porch area, so when it is raining the crowds can come and go without problems.  The poured pillars and beams will eventually hold a roof.  Those two doors will be the main entrance.

Lots of other jobs have gotten done.  The walls have been build up to roofing.  The metal conducts are in for the microphone wiring from the recording studio to the stage area.

 

Posted in Kigoma Community Center 2008, updates | No Comments »

Some Thoughts About December 13th

Friday, December 18th, 2009

Wow!

Our goal was $100,000 in one special “Reconnect Christmas Offering” on December 13th. The economy has been in the tank. A number of our church families have either lost their employment, fear they might lose their employment, and/or have already seen their compensation reduced as their company seeks ways to avoid layoffs. And besides, with all of the hurt here at home, why raise a boatload of cash to send to the other side of the world?

It seems more than the usual number of comments have been spoken, e-mailed, and voicemailed that “this will never work” because of the economy, or people are “worn out”, or “we need to focus on ourselves.”

Well, it’s true. The economy is still shaky and people are worn out (I’m pretty singed myself right now), and we have a bundle of big challenges before us as a congregation. No doubt about all of that.

So, did I want to “pull the plug” on the Reconnect Christmas project…in September, October, November, last week? Nope. I was hanging the whole thing on what we had all told one another over the past two years of congregational self-assessment. We said that a core value of our congregation, something that is true at all times and in all situations, is that we are a missional church. Taking away the “missional” component of our Christmas celebration would be like taking down the Christmas tree on December 20th or cancelling Christmas Eve services because it would be dark out, or deleting the Christmas carols from our worship these weeks because, well, there are other songs to sing and, besides, some of the carols are hard to sing. Foregoing a “special offering” on December 13th would be like denying ourselves. It is something we simply cannot do.

I had no “inside information” on the outcome. Just a confidence that we actually are a missional congregation. It isn’t marketing or wishful thinking. It is who, by God’s grace, we have become.

So the preacher preached (and cried a bit, too — at least at 9:45 service), the songs were sung, and the offering was taken: $106,000+ (with a bit more dribbling in this week). And, remembering that there indeed are children nearby in need, we also brought to worship over 1,200 toys for them.

I don’t know about you, but I am very proud of Wheatland Salem Church for being true to ourselves. The other challenges remain and the needs are still enormous here and around the world. But I feel much more prepared for Christmas now that we have given our attention to things that Jesus himself said were most important.

–Pastor Scott Field, Wheatland Salem Church

Tags: ,
Posted in Mahbubnagar School Project 2009, updates | No Comments »

Kigoma Construction Update

Wednesday, October 7th, 2009

We are back in Tanzania now. We had a good trip out. Just wanted to send you a few action photos of the construction of the community center. The walls are done, now. The shots below are the pouring of the second “ring beam”. It is a steel rebar reinforced concrete beam that circles the entire building. Also notice the vertical concrete columns.

Cement For Recording Studio Floor

Second Floor Construction

Scaffolding

Next week we will try to get the concrete ceiling poured over the recording studio. We are using concrete to make the ceiling for sound proofing.

In two weeks the Kingwood UMC construction team arrives to put the roof on the building. Remember them in your prayers as they plan and prepare.

Blessings,
Lowell

Tags: , , ,
Posted in Kigoma Community Center 2008, updates | No Comments »

These walls are strong!

Wednesday, June 3rd, 2009

The walls are going up on the community center.  The walls for the ground floor are done.  Next week we hope to begin installing the second floor joists for the rooms at the end of the building.  And we hope to begin pouring the concrete floors for the second story rooms next week.  After that, we will continue building the walls of the second floor level.

First Floor Walls Are Up

This doorway will someday lead to the new library.  We have thousands of volumes of good Christian books we are excited to get catalogued and made available to the pastors and Christian workers in our area.  Above this room, on the second floor, will be the radio studio.

Notice the reinforced concrete pillars and reinforced concrete ring beam.  We are doing everything we can to make the building earthquake proof.  We have had a 6.7 quake here.  None of our buildings failed.  We make them strong.

Reinforced Walls

Above is the construction of the new water tank — which is the end room of the new utility building.  A college student, Ryan, from KY is out helping and for the first time is trying his hand at laying brick.  Our new water well is producing 14 gallons per minutes of pure water and will give us a clean source of water for the community center and visitors’ guest houses.  No more boiling our water!  This new tank will hold thousands of gallons of water.  This picture was taken earlier in the week.  The tank walls are now four feet high.

New Water Tank

Well, our scaffolding might not be OSHA approved.  All work is done by hand under the blazing tropical sun.  Notice the burglar bars on the new windows.

Windows

This week we received another 15,000 bricks.  We decided to make the building’s walls three bricks thick, so we needed additional bricks.  The rolls of wire mess are for the concrete floor, when it comes time to pour it.

Bricks and Wire

-Lowell & Claudia

Posted in Kigoma Community Center 2008, updates | No Comments »

|

Share This Page on Twitter

btn-post-to-twitter

Become A Fan on Facebook

Latest Blog Post

An Update On Kigoma, April 2010

Here is an update on the community center.
We have spent some time designing and constructing the stairs to the radio/recording studio.  This is a Lowell Wertz design.  We built the pillar of Hercules, 20 inch square, rebar reinforced column,  then a metal platform landing for outside the second story door, then a metal beam made [...]

Read More