Kigoma Construction Update

We are back in Tanzania now. We had a good trip out. Just wanted to send you a few action photos of the construction of the community center. The walls are done, now. The shots below are the pouring of the second “ring beam”. It is a steel rebar reinforced concrete beam that circles the entire building. Also notice the vertical concrete columns.

Cement For Recording Studio Floor

Second Floor Construction

Scaffolding

Next week we will try to get the concrete ceiling poured over the recording studio. We are using concrete to make the ceiling for sound proofing.

In two weeks the Kingwood UMC construction team arrives to put the roof on the building. Remember them in your prayers as they plan and prepare.

Blessings,
Lowell

Tags: , , ,

This entry was posted on Wednesday, October 7th, 2009 at 4:06 pm and is filed under Kigoma Community Center 2008, updates. You can follow any responses to this entry through the RSS 2.0 feed. You can leave a response, or trackback from your own site.

This website uses IntenseDebate comments, but they are not currently loaded because either your browser doesn't support JavaScript, or they didn't load fast enough.

Leave a Reply

You must be logged in to post a comment.

Share This Page on Twitter

btn-post-to-twitter

Become A Fan on Facebook

Latest Blog Post

An Update On Kigoma, April 2010

Here is an update on the community center.
We have spent some time designing and constructing the stairs to the radio/recording studio.  This is a Lowell Wertz design.  We built the pillar of Hercules, 20 inch square, rebar reinforced column,  then a metal platform landing for outside the second story door, then a metal beam made [...]

Read More

Site Map